Taconite Inlet Project



a. Secchi transparency measurements (2.5m contours) from JD 202 showing widespread development of suspended sediment plume during second major discharge event. Note "right hand' deflection in delta-proximal area of the plume.

b. Profile of % light transmission along transect from sites 1 to 5, JD 202.